

Coriolis Force Apparatus
In engineering, the Coriolis force occurs when a rotational motion interferes with a further movement of the same object.
- Price Structure
- Direct factory wholesale on request by volume
- Tender Documentation
- Compliance sheets, BoQ & MAF authorization
- Quality Standards
- ISO 9001:2015 certified manufacture & CE conformity
Product Specifications & Overview
Coriolis Force Apparatus
Technical Description:
In engineering, the Coriolis force occurs when a rotational motion interferes with a further movement of the same object. This can occur for example in cranes, gearboxes or robots. The experimental unit is designed to clearly demonstrate the effect of the Coriolis force in a rotating reference system. A transparent water tank with submersible pump is placed on a rotatable arm and then rotated. Within the rotating reference system, the pump produces a water jet in a radial direction. Depending on the flow rate of the pump or the water velocity, as well as speed and direction of rotation, the water jet is visibly deflected due to the Coriolis force. The degree of deflection can be determined by means of a scale on the water tank. The speed is infinitely adjustable, electronically controlled and digitally displayed. The well-structured instructional material sets out the fundamentals and provides a step-by-step guide through the experiments.
Specification:
1. Visualisation of the Coriolis force effect 2. Rotating reference frame consisting of transparent water tank with submersible pump on a rotating arm 3. Deflection of a water jet in radial direction dependent on the speed and direction of rotation 4. Scale to read the deflection of the water jet 5. Closed water circuit 6. Speed sensor with digital displayTechnical Data:
Rotating arm
- infinitely adjustable speed: 0...60min-1 - adjustable direction of rotation
Submersible pump
- flow rate 10L/min
Technical Specifications & Manufacturing Details
| Product Line | Coriolis Force Apparatus |
|---|---|
| Discipline | Engineering Teaching Lab Apparatus |
| Manufacturing Standard | ISO 9001:2015 Quality Management System / CE Marking |
| Material Grade | Heavy-duty institutional grade, corrosion-resistant finish, laboratory safe |
| Export Packaging | Fumigated sea-worthy wooden crates with shock absorbent internal buffering (ISPM-15) |
| Inspection & Verification | Factory pre-dispatch inspection certificate included; third-party SGS / Bureau Veritas supported |
| Procurement Target | Universities, Technical Colleges, Secondary Schools, Research Institutes & Government Tenders |
Institutional Tender & Global Export Support
We provide itemized technical compliance schedules, bid security documentation assistance, manufacturer authorizations (MAF), and warranty compliance letters for public tenders.
Export shipping arranged under FOB, CIF, or CFR terms via major Indian sea ports (Nhava Sheva / Mundra) and air cargo hubs. Full bill of lading and export customs clearance provided.
Frequently Asked Questions
How do I request a quotation for Coriolis Force Apparatus?
Click 'Request a Quote' or 'Add to Quote' on this page, specify your target quantity and delivery country, or email info@labexports.com. Our export team responds within 24 business hours with an official Proforma Invoice.
Does LabExports provide tender documentation and compliance sheets?
Yes. We provide complete technical compliance sheets, Bill of Quantities (BoQ) support, ISO 9001:2015 certificates, and manufacturer authorization letters (MAF) for government, university, and Ministry of Education procurement tenders.
What are the export packaging and shipping standards?
Every item is packed in export-grade, fumigated, multi-ply sea/air-worthy wooden cases with shock-absorbing foam lining and waterproof barriers adhering to international ISPM-15 phytosanitary standards.
Can third-party pre-shipment inspections (e.g. SGS, Bureau Veritas) be arranged?
Yes. We routinely facilitate pre-shipment quality and quantity inspections by SGS, Bureau Veritas, Intertek, or any nominated third-party inspection agency before dispatch.






